Email: info@tokindustry.comTel: +86-15372657153


  • 80-156 Conical Twin Screw Barrel  For Cincinnati and Krauss Maffei Twin PVC Extruder
  • 80-156 Conical Twin Screw Barrel  For Cincinnati and Krauss Maffei Twin PVC Extruder
  • 80-156 Conical Twin Screw Barrel  For Cincinnati and Krauss Maffei Twin PVC Extruder
80-156 Conical Twin Screw Barrel  For Cincinnati and Krauss Maffei Twin PVC Extruder80-156 Conical Twin Screw Barrel  For Cincinnati and Krauss Maffei Twin PVC Extruder80-156 Conical Twin Screw Barrel  For Cincinnati and Krauss Maffei Twin PVC Extruder

80-156 Conical Twin Screw Barrel For Cincinnati and Krauss Maffei Twin PVC Extruder

Size: 55/110, 60/125, 65/132, 70/140, 75/150, 80/156, 92/188
Applicated machine:CINCINNATI, BATTENFELD, KRUSS MAFFEI,BAUSANO
Applied Plastics & Products: PP,PE,ABS,PVC,Pelleting,Pipe,Profile,Sheet,WPC,PVC,Soft PVC etc
Delivery Time: 7-15 days
Base Materials: SACM645,SCM440
Treatment: Nitrided/Bimetallic/Chrome-Plating
Hardness: HRC65-HRC70

Product Description:


Tech Introduction:

⁕Nitrided Process :


Basis Materials: SACM645

Hardness: 70 HRC

Allication: Plastic Recycling ≤1 Times, Plastics With Glass Fiber≤15%

Size: 55/110, 60/125, 65/132, 70/140, 75/150, 80/156, 92/188 (CINCINNATI, BATTENFELD, KRUSS MAFFEI,BAUSANO)

Wear resistance: 

Corrosion resistance: ★★

⁕Bimetallic Process :


Basis Materials: SACM645, SACM440, SKD61, SKD11: 

Hardness: 53-58 HRC

Coating Thickness: 1.5-2.0mm

Allication: Plastic Recycling ≤2 Times, Plastics With Glass Fiber≤35%

Size: 55/110, 60/125, 65/132, 70/140, 75/150, 80/156, 92/188 (CINCINNATI, BATTENFELD, KRUSS MAFFEI,BAUSANO)

Wear resistance: ★★★

Corrosion resistance: ★★

⁕Chrome Plating Process:


Basis Materials: SACM645, SACM440, SKD61, SKD11

Chrome Thickness: 0.02-0.08mm

Hardness of Chrome: >700 HV

Finish Grade: Ra ≤0.4

Allication: PVC and other high corrosive plastics

Wear resistance: 

Corrosion resistance: ★★★★


1714462601163515.jpg


1710838791830697.jpg

1710838733688215.jpg


Shipment: 

1. The delivery time of our screw barrel is usually 20-25 days after drawings are confirmed.

2. Faster air shipment by TNT, SF, FedEx, DHL, UPS, EMS and etc.

1709692134229380.png


Inquiry:

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Richard Wang

Phone: 15372657153

Tel: +86-15372657153

Email: info@tokindustry.com

Add: No.1807, R&D Park C Zone -12, Guanghua Road, Hi-Tech District, Ningbo, China

Leave a message

 
Top