Email: info@tokindustry.comTel: +86-15372657153


  • 80mm Twin Screw Barrel for JWELL Plastics Horizontal Twin Parallel high-speed corrugated pipe production line
  • 80mm Twin Screw Barrel for JWELL Plastics Horizontal Twin Parallel high-speed corrugated pipe production line
80mm Twin Screw Barrel for JWELL Plastics Horizontal Twin Parallel high-speed corrugated pipe production line80mm Twin Screw Barrel for JWELL Plastics Horizontal Twin Parallel high-speed corrugated pipe production line

80mm Twin Screw Barrel for JWELL Plastics Horizontal Twin Parallel high-speed corrugated pipe production line

Screw Size: 80mm, L/D: 1:28
Delivery time: 20-25 days
Base Materials: SACM645,SCM440
Treatment: Nitrided & Bimetallic
Hardness: HRC65-HRC70

Product Description:

平双螺杆(1)(1)(1).jpg

Tech Introduction:

⁕Bimetallic Process :


Basis Materials: SACM645, SACM440, SKD61, SKD11

Hardness: 53-58 HRC

Coating Thickness: 1.5-2.0mm

Allication: Plastic Recycling ≤2 Times, Plastics With Glass Fiber≤35%

Wear resistance: ★★★★★

Corrosion resistance: ★★★

⁕Chrome Plating Process:


Basis Materials: SACM645, SACM440, SKD61, SKD11

Chrome Thickness: 0.02-0.08mm

Hardness of Chrome: >700 HV

Finish Grade: Ra ≤0.4

Allication: PVC and other high corrosive plastics

Wear resistance: ★★

Corrosion resistance: ★★★★★


⁕Full Hardened Process:


Basis Materials: DC53, D2, M2, SKD61, SKD11 ...

Chemical Composition: C, Si, Cr, Mn, Mo, V, Ni

Hardness: SKD61(HRC56-58), DC53( 62-63 HRC)

Application: PP PA LCP, POM, PPA, PBT, PC, PPS, PEI, PEEK with Glass Fiber ≤50%

Wear resistance: ★★★★★

Corrosion resistance: ★★★★★

1718107706626514.jpg

FAQS:


Q: When will you arrange the production?
A: We usually arrange the production immediately after receiving your 30% TT.

Q: What is your factory delivery time ?
A: Standard delivery time is 20 days, if the screw's diameter is less than 50mm, the delivery time will be faster to 15 days, also we have 2000 stock items ready to ship out.

Q: What is your accepted payment type?
A: T/T ,Western Union and Alipay

Q: What logistic forwarder do you usually work with?
A: We work with EMS, TNT, UPS, FEDEX and other logistric forwarders. Assigned your own forwarder for shipment is available.

Q: What is your warranty Time ?
A: Our warranty time is 12 months for all screw barrel and accessories products After delivery.

1718107706626514.jpg


制造展示_副本_副本.jpg

line.jpg


产品展示-素材 - 副本_副本_副本(1).jpg

line.jpg


产品展示-素材 - 副本_副本 - 副本_副本(1).jpg

line.jpg

Fast Shipment: 

1. The delivery time of Injection Molding screw barrel is usually 20-25 days after drawings confirmed.

2. Faster air shipment can by TNT, SF, FedEx, DHL, UPS, EMS and etc.

3. Standard Packages are high quality wooden cases

锥双发货_副本.jpg

Inquiry:

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Richard Wang

Phone: 15372657153

Tel: +86-15372657153

Email: info@tokindustry.com

Add: No.1807, R&D Park C Zone -12, Guanghua Road, Hi-Tech District, Ningbo, China

Leave a message

 
Top